|
|
| Section ΒΗ (2010) ... State Plan for Week 3 Horizontal (normal) ... 1 Jul 2010 |
| Section ΒΖ Νorth (2010) ... In Plans and Drawings database as DA 12513 (PK 2018). Horizontal (normal) ... 1 Jul 2010 |
| Section ΒΗ (2010) ... State Plan for Week 4
In Plans and Drawings database as DA 12518 (PK 2018). Horizontal (normal) ... 8 Jul 2010 |
| Section ΒΘ (2010) ... State Plan for Week 4
In Plans and Drawings database as DA 12519 (PK 2018). Horizontal (normal) ... 7 Jul 2010 |
| Section Δ (2010) ... In Plans and Drawings database as DA 12499 (PK 2018). Horizontal (normal) ... 8 Jul 2010 |
| Wheelbarrow ramp after removal of greyish green fill, leaving greener fill (green arrow, B.28) and red fill (red arrow, B.22). [After Basket 23; During Basket 22; Before Basket 28] ... Laura Gawlinski ... southeast Horizontal (normal) ... 20 Jul 2010 |
| After removal of ashy fill, revealing white fill, with brown fill in corner (arrow, B.27). [After Basket 25; Before Basket 27] ... Laura Gawlinski ... northeast Horizontal (normal) ... 20 Jul 2010 |
| After removal of fill beneath vessel SE of cistern G 14:3 (cistern edge visible in background). [After Basket 17] ... Laura Gawlinski ... northwest Horizontal (normal) ... 20 Jul 2010 |
| Before removal of patch of orange fill (arrow). [After Basket 27; Before Basket 29] ... Laura Gawlinski ... northeast Horizontal (normal) ... 21 Jul 2010 |
| After removal of patch of orange fill. [After Basket 29] ... Laura Gawlinski ... northeast Horizontal (normal) ... 21 Jul 2010 |
| After removal of fills north and west of drain, exposing more white pebbly fill, also visible continuing under later feature. [After Basket 29; During Basket 20] ... Laura Gawlinski ... northeast Horizontal (normal) ... 21 Jul 2010 |
| After removal of fills north and west of drain, exposing more white pebbly fill, also visible continuing under later feature (arrow). [After Basket 29; During Basket 20] ... Laura Gawlinski ... northwest Horizontal (normal) ... 21 Jul 2010 |
| Removal of rubble. [During Basket 132] ... Kevin Daly ... southeast Horizontal (normal) ... 5 Aug 2010 |
| After the vessel is removed.[After Basket138; Before basket 139] ... Kevin Daly ... north Horizontal (normal) ... 5 Aug 2010 |
| After the loose soil below the vessel is removed. [After Basket 139] ... Kevin Daly ... north Horizontal (normal) ... 5 Aug 2010 |
| We come down on more pottery in the preserved triangle north of Wall N. [After Basket 137; Before Basket 141] ... Kevin Daly ... northeast Rotate 90 CW ... 5 Aug 2010 |
| Wall 9 robbing trench after removal of brown fill on top of rocky packing in Basket 31. [After Basket 131] ... Kevin Daly ... northeast Horizontal (normal) ... 5 Aug 2010 |
| Wall 9 robbing trench after removal of brown fill on top of rocky packing in Basket 31; detail of raised areas of rocky packing. [After Basket 131][After Basket 131] ... Kevin Daly ... west Horizontal (normal) ... 5 Aug 2010 |
| Before removal of sandy red-brown clump in Wall 9 robbing trench (positioned against north cut of robbing trench). [Before Basket 140] ... Kevin Daly ... north Horizontal (normal) ... 5 Aug 2010 |
| After exploring the rubble at the west and moving to the rubble at the northeast. [After Basket 132; Before Basket 142] ... Kevin Daly ... southeast Horizontal (normal) ... 5 Aug 2010 |
|
|