icon

[Agora Image] 2012.37.1085 (Section ΛΛ 10)

Channel E from northeast. Layer IV. At left, Modern Wall ... AMS Horizontal (normal) ... Channel E from northeast. ... At left, Modern Wall.

icon

[Agora Image] 2012.47.0268 (Section Τ 1031)

Cut 32-42, from the west. Layer I and modern trenches removed. A = Turkish house area. B and D = Layer II. C = Channel h trench. E = Trench over aqueduct. F = Modern pier ... AMS Horizontal (normal) ... Layer I and modern trenches removed. ... B and D = Layer II. C = Channel h trench. E = Trench over aqueduct. F = Modern pier.

icon

[Agora Image] 2012.30.1186 (Section Β 395)

Layer V gone. View from northwest. A: south wall of metroon, B: limestone polygonal wall, C: modern wall, D: north drain channel, E: middle drain channel, F: Β 2124, G: Β 2126 ... AMS Horizontal (normal) ... A: south wall of metroon, B: limestone polygonal wall, C: modern wall, D: north drain channel, E: middle drain channel, F: Β 2124, G: Β 2126.

icon

[Agora Image] 2012.37.1084 (Section ΛΛ 9)

Channel E from southwest. X at hole for West Trench of Hellenistic Building. Layer IV-V shown. Y=Posros Block. At top, Cistern and at right, Modern Wall ... AMS Horizontal (normal) ... Channel E from southwest. ... At top, Cistern and at right, Modern Wall.

icon

[Agora Image] 2012.47.0271 (Section Τ 1034)

Cut 21-31, from the west. Layer I and modern drains removed. A = Turkish house. B = 'Doorstep'. C = 'fill'. D = Road strosis Layer II. E = Channel h trench. F = Layer II with bedrock along south. G = Masonry ... AMS Horizontal (normal) ... Layer I and modern drains removed. ... D = Road strosis Layer II. E = Channel h trench. ... G = Masonry pier. H = Modern drain trench.

icon

[Agora Image] 2012.47.0266 (Section Τ 1029)

Road Cut 43-53, from the west. Modern drains and Layer I removed. A = trench. B = Road Strosis, Layer II. C = North-South Cut through Layer II. D = Channel h trench. E = Road strosis, Layer II. F = Trench ... AMS Horizontal (normal) ... Road Cut 43-53, from the west. Modern drains and Layer I removed. ... C = North-South Cut through Layer II. D = Channel h trench. E = Road strosis, Layer II.