1959 Ψ

Section Ψ Supplementary Exploration: July-August 1959 ... Eugene Vanderpool ... Excavations in Section Ψ did not go to the bottom throughout the area; considerable masses of early fill were left. Instead, late disturbances and test cuts down to bedrock revealed enough of both stratification ... 29 Jul-20 Aug 1959 ... Instead, late disturbances and test cuts down to bedrock revealed enough of both stratification and structural remains to estimate that nothing of great consequence escaped the attention of the excavators.

icon

1967 Ε

Section Ε: 1967 ... T. Leslie Shear, Jr ... The campaign of 1967 included both excavation and architectural study of various monuments in Section Ε along the east side of the Great Drain. Excavation took place in and about the Peribolos of the Eponymous ... 4 Jun-2 Aug 1967 ... Additionally five cross trenches were opened to test the stratification of the area and the history of the Great Drain.